Advertising
Advertising

Working within an empty shell, the design had to accommodate plumbing fixtures and existing concrete floors and ceilings.

Photo
Originally appeared in Urban Usonian
on August 3, 2009
Working within an empty shell, the design had to accommodate plumbing fixtures and existing concrete floors and ceilings.
Working within an empty shell, the design had to accommodate plumbing fixtures and existing concrete floors and ceilings.

Appears in

Advertising